- AUETD Home
- Browsing by Author
Browsing by Author "Harvey, Bryan"
Now showing items 1-1 of 1
- Sort by:
- title
- issue date
- submit date
- Order:
- ascending
- descending
- Results:
- 5
- 10
- 20
- 40
- 60
- 80
- 100
Design & Construction Planning of Rapid Bridge Deck Replacement Systems for I-59 Bridges at Collinsville, AL
Harvey, Bryan (2011-12-13)
Many bridges in the Birmingham area have deteriorated decks that need to be rehabilitated or replaced. Several of these are major interstate bridges that carry large volumes of traffic. Rehabilitation or replacement of the ...